OG&E - Oklahoma Gas & Electric
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 1
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
If the electricity generated by the net energy customer exceeds the electricity consumed by the net energy customer during the monthly billing period, the customer shall be credited, or paid, in dollars in the next billing period(s) at the avoided cost ($ not offered)
Customers will be automatically changed to a TOU rate post PTO.
Residential Customer-Owned Solar Time of Use Rates*
Rate changes daily/monthly (or as needed)
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Tap Criteria
Piercing connectors allowed
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 125
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
System must be sized as accurately as possible. Maximum offset is 125% of their historical loads. If it goes over 125% then they will not be eligible for the Net Energy Billing Option.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-PM-Disco-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
Relay Meter Orientation = Under/Over
INVERTER→ METER → DISC→POI
Production meter must show bottom lugs going to inverter and top lugs to the POI. See files for example.
- Electric Service Reqs
- DER installations must confirm to NEC, NFPA 90, IEEE 547, UL 1741
- Install Reqs
AC Disconnect Required
- Required to be outdoors
- Must be within 10 feet of the main utility or DER (PV) meter
- Must be installed between 48"-66" from ground level
Production Meter Required
Multiple photos required as well for PTO submission/utility inspection:
- BOS photo (with placards) that show the entire system - wide angle format and close-up
- Meter socket photo that shows the bypass plate / cover
- Please ensure that we install the meter socket cover (attached example) and we'll need a photo of this as well.
- PV modules photos (must match exactly what's on Site Plan/Roof Plan)
- Placards
Placards Required - Examples uploaded to files
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 4238646
- Express Planset Eligible
- No