Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

NorthEast Oklahoma Electric Cooperative

Oklahoma Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

At the end of the billing period, consumers are billed based on the sum of delivered and received power. If a member produces more energy than they consume, the kWh charge is zero and the bill will reflect the excess energy which shall be credited during the next billing period to the member at the monthly avoided energy cost ($0.024) per kilowatt-hour. If a member uses more than they produce, they are billed for the energy used along with the monthly service charge.

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
125
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

Facilities with installed capacity 125% or greater than the producer's peak load may be excluded from the "Optional Net Metering Arrangement"

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

NOEC does not allow any solar equipment to be installed in their meter boxes, poles or any NOEC equipment.

The interconnection has to be on the homeowner’s side with a visible Lockable Disconnect easily accessible to NOEC employees.

Install Reqs

AC Disconnect Required

  • Producer shall install, own, and maintain a disconnecting device at a location which shall at all times be visible and accessible to Cooperative personnel. The disconnecting device shall be installed at a mutually agreed to location between Producer and Cooperative. The disconnecting device shall have lockout capability.

Inverter must be UL 1741 listed

Electrical Stamp Required
1
Equipment Approvals
California Energy Commission

Other details

Revision Required
1
Mod Swap Requires Planset
1
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with NorthEast Oklahoma Electric Cooperative before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.