Edmond Electric (City of Edmond)
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
The received kWh will be deducted from the delivered kWh, if the result is negative OR zero the customer will only pay the monthly charge + applicable tax. No credit will be given for excess generation supplied back to the Edmond Electric
distribution system from the Customer’s distributed generation system
- Rebates Offered
- 0
- Deregulated
- 1
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- No
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
10 kW AC max for Residential projects
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
Plans & docs
- Site Plan Reqs
(SYSTEM LAYOUT):
ï‚§ SHOW LOCATION OF DISCONNECTS AND INVERTERS
ï‚§ SHOW LOCATION OF ALL MODULES AND ALL BATTERIES
ï‚§ SHOW LOCATION AND CONNECTION OF ALL GROUNDING ELECTRODE CONDUCTORS
ï‚§ SHOW LOCATION OF THE EQUIPMENT WITHIN THE STRUCTURE
(SITE PLAN):
ï‚§ PROVIDE DIMENSIONS OF CLEARANCES AROUND ALL EQUIPMENT
ï‚§ PROVIDE DIMENSIONS BETWEEN EQUIPMENT AND STRUCTURES
ï‚§ PROVIDE DIMENSIONS FROM EQUIPMENT TO PROPERTY LINES
- SLD Reqs
(SYSTEM DESIGN):
 MANUFACTURER’S CUT SHEETS
ï‚§ ELECTRICAL PLANS
ï‚§ CALCULATIONS USED TO DETERMINE WIRE SIZES, FUSE AND BREAKER TYPE AND SIZING:
INCLUDING TEMPERATURE DERATION FACTORS PER THE NEC TABLE 690.31©.
ï‚§ ROOF MOUNTED SYSTEMS SHOULD USE THE WORST-CASE SCENARIO FOR AMBIENT TEMPERATURE OF 56-60 DEGREES C.
SEE NEC TABLES 310.15 (B)(2)(A); (B)(3)(A) & (B)(3)(C).
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Rate Schedule Link
- link
- Website
- link
- Phone
- (405) 359-4780
Other details
- Restrict Inspection
- 1
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 5605941
- Express Planset Eligible
- Yes