Toledo Edison (FirstEnergy Corp)
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed1
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- N/A
- Net Excess Generation Notes
Each kWh of energy received from the customer offsets the energy delivered to the customer on a one for one basis, up to the amount of energy delivered to the customer during a billing period. Excess energy received from the customer is credited to the customer's account at the applicable generation component of the customer's rate schedule.
- Rebates Offered
- 1
- Deregulated
- 1
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 1
- Load Taps Allowed
- 0
- Tap Criteria
- Line side taps are allowed but not in meter can.
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 120
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Size Justification
- Load Justification
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- Property layout, street access, North arrow (with proper orientation), and nearest cross streets in each direction. Indicate direction of nearest cross street if impractical to show on drawing.
- Ground mounts must show clearances, setbacks, details of surrounding structures (especially how they cross utility's facilities), and route and length of electrical connections from installation to main premises.
- Location of AC disconnect
- Location of generation, inverter, storage and associated electrical equipment
- Location of service transformer
- SLD Reqs
- Identify utility meter, inverter, generation source and storage (battery) equipment.
- Indicate DC and AC ratings of any generation source.
- Indicate AC rating of the inverter.
- Identify make and model of the Utility AC Disconnect and note that it is lockable with a visible break.
- Identify POI.
No attachments by the customer or the customer’s agent are permitted to Company-owned meters, meter circuits, or ancillary meter devices. The following are considered unauthorized connections when not made, installed, or performed by a Company employee or an authorized representative of the Company:
- Any adapter placed between the revenue meter and meter socket
- Attachments or connections to the potential or current circuits of transformer rated revenue meters
- Any connection inside the meter socket
- Electrical Stamp Required
- 0
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Rate Schedule Link
- link
- Website
- link
- Phone
- (800) 447-3333
Other details
- Restrict Inspection
- 1
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 299463
- Express Planset Eligible
- Yes