The Illuminating Company

Ohio Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed1
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

When the monthly electric bill is calculated, if the customer uses more electrical energy than is generated, the customer pays only for the net kilowatt-hours (kWh). If the customer generates more electrical energy than

is used from the utility electrical system, then the customer receives a kWh credit, which is applied to future bills. In addition, the customer is required to pay any customer charges and minimums applicable under their

rate schedule.

Rebates Offered
0
Deregulated
1
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
1
Load Taps Allowed
0
Tap Criteria

Taps are allowed as long as they are not in the meter enclosure

Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
120
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Size Justification
Load Justification
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Meter Spot Process

TDR Process Call Customer Service

TDR - Who to

Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • Overall property layout and street access including North arrow orientation and the nearest cross street in each direction. (Indicate direction of nearest cross street if impractical to show on drawing).
  • Ground mounted installations must show clearances and details of surrounding structures especially how they cross the Company's facilities. The route and length of the electrical connection to the premise is also required.
  • Location of the DER AC disconnect meeting the requirements of the NEC - for self-contained metering locations.
  • Location of the DER utility required AC visible break disconnect - for metering locations utilizing instrument transformers.
  • Location of generation, inverter, storage and associated electrical equipment. 
  • Location of service transformer.
SLD Reqs
  • Energy source (PV array, wind turbine, etc.). Please indicate DC and AC ratings as appropriate.
  • Please indicate AC rating of the inverter.
  • Identify the make and model of the disconnect switch and note if it is lockable with a visible break when required.
  • Identify connection to Customer’s electrical system.
  • Identify utility meter, inverter and/or associated generation and storage (battery) equipment.


Battery

  • ac disconnect required between inverter and gateway


No attachments by the customer or the customer’s agent are permitted to Company-owned meters, meter circuits, or ancillary meter devices. The following are considered unauthorized connections when not made, installed, or performed by a Company employee or an authorized representative of the Company:

• Any adapter placed between the revenue meter and meter socket

• Attachments or connections to the potential or current circuits of transformer rated revenue meters

• Any connection inside the meter socket

Placards

Must be permanent in nature and capable of withstanding the conditions of its location including:

  • Adverse weather (wind, snow, ice, rain, etc.)
  • Sunlight (UV tolerant)
  • Not subject to concealment (painting, foliage, construction, etc.)
  • The preferred material is hi-contrast engraved laminated plastic, either screwed or permanently bonded to the device or wall immediately adjacent to the device


Must be clearly legible

  • Title lettering must be of sufficient size and content to adequately convey its purpose from a distance of not less than 15 feet.
  • Body lettering must be legible from not less than 3 feet.


Must contain adequate content to convey it’s purpose

  • Disconnecting means shall be adequately labeled to identify its function and also include any necessary precautionary instructions.
  • Placards indicating the location of other devices shall include the name and function of the device as well as clear directions to its location
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Rate Schedule Link
link
Website
link
Phone
(800) 589-3101

Other details

Restrict Inspection
0
Address ID
299391
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with The Illuminating Company before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.