South Central Power Company
Net Metering Allowed0
NEM TypeN/A
Line Taps Allowed0
Load Taps Allowed0
MPU Rules<ul><li>If removal of a meter is necessary during the interc
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 0
- NEM Type
- N/A
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Value Notes
- will be purchased by Buckeye power @ Avoided cost
- Net Excess Generation Notes
The Power Company shall use an hourly kWh period to measure the Consumer’s net production. The net production output shall be measured by determining during each such period the production in kilowatt-hours (kWh) of the Electric Generating Facility in excess of the requirements of the Consumer’s electric consumer facilities. Any such output of the Electric Generating Facility in excess of the requirements of Consumer’s electric consuming facilities shall be sold to Buckeye Power, Inc. The Power Company shall bill the net electric usage pursuant to the Power Company’s applicable Net Billing Rate Schedule, and credit the net electric output at Buckeye’s purchase rate.
- Rebates Offered
- 0
- Deregulated
- 1
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- MPU Rules
- If removal of a meter is necessary during the interconnection installation, contact them Power at to schedule a temporary disconnect
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 120
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- 0
- System Offset Notes
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Meter Spot Required
- 1
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
- The diagram must include the design on the member’s side of the meter, including a visible, lockable AC disconnect.
TAPS
- South Central Power does not permit hard tapping or tap connectors of service entrance conductors prior to the first means of disconnect. If you choose to do a source-side connection, it may be established through approved bus lug connectors.
- Prefers load-side interconnection
- Electric Service Reqs
- Placards
NEC standards
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (800) 282-5064
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 1
- Address ID
- 650526
- Express Planset Eligible
- Yes