Pioneer Rural Electric Coop
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 0
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate
- 0.07
- Solar Export Rate Approx
- 0.077
- Net Excess Generation Notes
Any system output that goes through the meter to the grid during the billing cycle will be credited on the bill at $ 0.077 cents per kilowatt-hour (based on 2022 - can change each year).
- Rebates Offered
- 0
- Deregulated
- 1
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- AC Disconnect required - Outside and accessible 24/7
- SLD Reqs
- AC Disconnect required
- Website
- link
- Phone
- (800) 762-0997
Other details
- Restrict Inspection
- 0
- Address ID
- 1096200
- Express Planset Eligible
- Yes