Ohio Edison Co

Ohio Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

NEM Type
Monthly
Post Solar Billing Method
Net Metering
Net Excess Generation Notes
Each kWh of energy received from the customer offsets the energy delivered to the customer on a one for one basis, up to the amount of energy delivered to the customer during a billing period. Excess energy received from the customer is credited to the customer's account at the applicable generation component of the customer's rate schedule.

Interconnection & taps

Approval Req To Install
No
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2