LMRE - Lorain-Medina Rural Electric Cooperative
Net metering & export
- Net Metering Allowed
- 0
- TOU Utility
- 1
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Other
- Solar Export Value Notes
- All On-Peak kWh per month @ $.095648 per kWh / All Off-Peak kWh per month @ $.055648 per kWh
- Net Excess Generation Notes
Any output of the qualifying facility shall be transferred to the Cooperative and credited against the Consumer’s bill for electric service hereunder. Consumer shall be entitled to receive a billing credit for any such output of the qualifying facility at the current per kWh Buckeye excess credit rate for small renewable generation in accordance with a written agreement with the Cooperative.
Excess will be determined using a single meter or pair of meters capable of registering the flow of electricity in each direction from the Cooperative's electric distribution system to Consumer's electric consuming facilities located on the Premises, and from Consumer's qualifying facility to Cooperative's electric distribution system.
- Rebates Offered
- 0
- Deregulated
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
- The Consumer’s “annual electric energy requirements” shall be the average amount of electricity consumed annually by the Consumer for the electric consuming facilities located on the Premises over the previous three years, using the annual period of June 1 to May 31.
- If the Cooperative does not have the data or cannot calculate the average amount of electricity consumed annually over the previous three years, such as in instances of new construction of vacant properties, the Cooperative shall use any available consumption data to estimate the annual electricity consumption for the Consumer’s electric consuming facilities located on the Premises and provide the estimation data to the Consumer.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-PM-Disco-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
- Top of PV meter to be wired toward inverter, bottom toward POI
- Must include the configuration of the proposed DR system, including the protection and controls, disconnection devices, nameplate rating of each device, power factor rating, transformer connections, and other information deemed relevant by the DR owner and/or the Cooperative.
- Placards
• The AC disconnect switch must be clearly labeled as a DR disconnect switch.
- Website
- link
- Phone
- (440) 647-2133
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 1821800
- Express Planset Eligible
- No