Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

The cost of 1kWh produced = The cost of 1kWh used, unless you produce more kWh than consumed in a month. At that point, your kWh will be credited at the generated rate on your current month bill.

Rebates Offered
0

Interconnection & taps

Approval Req To Install
No
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Combination
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-PM-Disco-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect

Plans & docs

Site Plan Reqs

Site plan must show:

  • All equipment being installed
SLD Reqs
  • 4 line stamped line diagram
  • PV meter socket base required. Wired line (top) toward inverter, bottom (load) toward POI. See example in files section.
  • AC Disconnect to be wired bottom (load) toward PV meter, top (Line) toward POI. See example in files section.
  • Need to illustrate actual connections inside equipment. See example in files section.
  • Show bond in MSP
Electrical Stamp Required
1
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
1
Address ID
3812050
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Holmes-Wayne Electric Coop Inc before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.