Ohio Utility Interconnection & net metering rules
Net Metering Allowed0
NEM TypeN/A
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
0
NEM Type
N/A
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Net Excess Generation Notes

The Consumer shall use the output of the Electric Generating Facility first to meet the requirements of Consumer’s electric consuming facilities located on the Premises. The Power Company shall use an instantaneous kWh net billing period to measure the Consumer’s net production. The net production output shall be measured by determining during each such period the production in kilowatt-hours (kWh) of the Electric Generating Facility in excess of the requirements of the Consumer’s electric consumer facilities.


Per billing period, Excess energy will be purchased by Buckeye Power, Inc at their purchase rate (determined by Buckeye Power, Inc.). In the event that at the end of the annual period ending May 31 of each year the aggregate dollar amount of the billing credits for such year exceeds the aggregate dollar amount of the Power Company’s charges to the Consumer for such year, the Power Company shall issue a check to the Consumer for such excess dollar amount.

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Combination
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect

Plans & docs

Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Phone
(937) 548-4114

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
9287655
Express Planset Eligible
Yes