City of Wadsworth (OH)

Ohio Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

The credit to the customer shall not exceed the dollar amount the city bills the customer for energy consumption in any billing period. Instead, the net excess dollar amount shall be allowed to accumulate as a net excess generation (NEG) credit to offset the customer's energy charges in the next billing period. The credit will be adjusted based on the currently used power cost adjustment net excess generation (NEG) credits, if any, will be carried over from month to month. Following the customer's December billing cycle, the customer's credits balance will be reset to zero. Any unused net excess generation (NEG) credits will be retained by the city


Summer On Peak

$0.0935

Summer Off Peak

$0.0460

Winter On Peak

$0.0726

Winter Off Peak

$0.0392

Rebates Offered
No
Deregulated
Yes

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Standard

SLD Reqs

Standard

Electric Service Reqs

AC Disconnect Required

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Website
link
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Wadsworth (OH) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.