Ohio Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

The credit to the customer shall not exceed the dollar amount the city bills the customer for energy consumption in any billing period. Instead, the net excess dollar amount shall be allowed to accumulate as a net excess generation (NEG) credit to offset the customer's energy charges in the next billing period. The credit will be adjusted based on the currently used power cost adjustment net excess generation (NEG) credits, if any, will be carried over from month to month. Following the customer's December billing cycle, the customer's credits balance will be reset to zero. Any unused net excess generation (NEG) credits will be retained by the city


Summer On Peak

$0.0935

Summer Off Peak

$0.0460

Winter On Peak

$0.0726

Winter Off Peak

$0.0392

Rebates Offered
0
Deregulated
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Standard

SLD Reqs

Standard

Electric Service Reqs

AC Disconnect Required

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link

Other details

Address ID
4315257
Express Planset Eligible
Yes