Buckeye Rural Electric Cooperative
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
There will be two meters at the customer’s service location, one additive and one subtractive. The bill shall be calculated using the net amount used. If the amount of kWh on the subtractive meter exceeds the additive meter, the amount of kWh sold to BREC shall be compensated as a credit limited to the Generation & Transmission component of the bill.
The Consumer shall use the output of the Electric Generating Facility first to meet the requirements of Consumer’s electric consuming facilities located on the Premises. Any output of the Electric Generating Facility in excess of the requirements of Consumer’s electric consuming facilities shall be transferred to the Power Company and credited against the Consumer’s bill for electric service. Consumer shall only be entitled to receive a billing credit ($) for any such output of the Electric Generating Facility in excess of the requirements of the Consumer’s facilities, and in no event shall the Consumer be entitled to receive any payment from the Power Company for any such excess output of the Electric Generating Facility.
- Rebates Offered
- 0
- Deregulated
- 1
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 120
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Meter Spot Process
- Allowed Meter Adapter
- ConnectDER
Plans & docs
- SLD Reqs
- Placards
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (800) 231-2732
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 647965
- Express Planset Eligible
- Yes