Mt. Wheeler Power

Nevada Utility Interconnection & net metering rules
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
0
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

No specific requirements from utility to have on the Site Plan

SLD Reqs

Meter Socket is required for each of the PV Lines.

Electric Service Reqs

**System Sizing**

Mt. Wheeler Power does not restrict the amount of System Production the system provides. But for Net Metering customers, they are only crediting the customer's account up to 120%


"Net Metering Program shall be available to Cooperative’s Customers until the combination of all Customer-owned generating systems exceed 120 kW (0.1% of peak system Demand) or until Cooperative limits interconnections to a prescribed amount of kW in excess of 120 kW. "


**AC Disconnect:**


* Must provide a Disconnect Switch (Visible Open Disconnect Switch) that meets applicable ANSI, IEEE, UL and local governmental and Cooperative standards.

* Disconnect must be accessible to Cooperative personnel at all times, and Cooperative personnel must be allowed to padlock it in the OPEN position at any time for any reason.

* Disconnect Switch must be located on the exterior of the building, preferably adjacent to the electrical service entrance equipment.

* Disconnect Switch must be permanently and visibly marked as "Generated Disconnect" in letters at least 2" high.

* If the Disconnect Switch is not adjacent to the electrical service entrance equipment, a permanent/weather resistant map shall be installed at the location detailing where the Disconnect Switch is located.


**Taps: **


* No Line Side Taps Required

* Load Side Taps Are Allowed

Website
link
Phone
(775) 289-8981

Other details

Restrict Inspection
0
Address ID
108111
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Mt. Wheeler Power before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.