Alamo Power District No 3

Nevada Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
No
TOU Utility
No
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.04579
Solar Export Value Notes
Avoided cost changes monthly
Net Excess Generation Notes

The energy delivered from APD3 to the Customer in a regular monthly billing cycle, will be charged at APD3’s current rate schedule. Any energy the Customer generates that is received by APD3 in a regular monthly billing cycle will be credited to the Customer’s account at APD3 avoided cost of power. The Customer will receive a monetary credit for the energy received by APD3. If credit exceeds the delivered charge, the credit will be carried forward to the next month’s billing statement. At the end of each calendar year following the commencement of Interconnection Agreement by both Parties, APD3 will zero the Customer’s account of any excess credits. There will be no credit or buyback for the excess energy generated by the Customer. 

Rebates Offered
No
Deregulated
Yes
Allows Standby
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
Combination
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect

Plans & docs

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Rate Schedule Link
link
Website
link
Phone
(775) 725-3335

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Alamo Power District No 3 before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.