Otero County Electric Cooperative

New Mexico Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.02
Net Excess Generation Notes

"The qualifying facility shall be billed for the net energy delivered from the utility in accordance with the

tariffs that are applicable to the qualifying facility. At the end of the billing period the utility shall net all charges owed to the utility by the qualifying facility. If a net amount is owed to the qualifying facility for the billing period, and is less than $50, the payment amount may be carried over to the following billing period. If a net amount is owed to the qualifying facility and is $50 or more, the utility shall make payment to the qualifying facility prior to the end of the next billing period. "

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
120
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

You cannot generate more than 120% of a year’s usage. It also depends if a certain feeder is oversaturated with PV, then we look at each system individually to determine if there will back feed on our transmission system.

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

Relay Meter Orientation = Over/Under


REC METER REQUIRED: The wiring from the solar side should be on the top lugs of the meter. The bottom lugs should go to the utility side. 

Electric Service Reqs

Must meet NMPRC Ruling 568 and NMPRC Ruling 570

Install Reqs

We would encourage all interconnections to include the installation of a meter base for a Renewable Energy Certificate (REC) meter. In addition to the benefits of the utility meter registering the net of forward and reverse consumption, the REC meter, installed on the output (AC side) of the inverter, would register everything your unit would generate. Every 1,000 kilowatt-hours generated would create one REC, which for systems 25 kW and smaller, OCEC would then purchase at a defined rate of $1.00 per REC.  

Rate Schedule Link
link
Website
link
Phone
(800) 548-4660

Other details

Restrict Inspection
0
Address ID
153423
Express Planset Eligible
No