NM - City of Aztec Electric Department
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 0
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Fixed kWh
- Solar Export Rate
- 0.0425
- Net Excess Generation Notes
Solar production will first be routed to the home, if the system produced more than what is being consumed, then the excess energy will be exported to the grid. Excess generation is defined as the kWh that was exported to the utility that wasn't used during the day (when electricity was generated),the municipality will purchase the excess kWh at a fixed rate $0.0425
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- No
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Install Reqs
We need to be licensed with the city and state before we can commence any work.
Residential solar project is limited to 200A or less (anything over will be considered as "Commercial solar project" and it'll have its own process and requirement.
- Rate Schedule Link
- link
- Website
- link
- Phone
- (505) 334-7667
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 0
- Address ID
- 2543689
- Express Planset Eligible
- Yes