Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

MSMEC - Mora San Miguel Electric Cooperative

New Mexico Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

"If electricity generated by the customer exceeds the electricity supplied by the grid during a billing period, the utility shall credit the customer on the next bill for the excess kilowatt-hours generated,

by:

(1) crediting or paying the customer for the net energy supplied to the utility at the utility's energy rate pursuant to NMPRC Rule 570.17"

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Combination
Offset Value
120
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

We allow systems up to 25 kw AC capacity, however, systems larger than 10 KW require a system impact study by a licensed engineer at the customer’s cost. We don’t buy back kwh credits unless consumer leaves the system so it doesn’t make sense to oversize a system.

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
Yes
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

A site map must be submitted showing all component locations and manual AC disconnect must be installed between inverter(s) and our meter  

SLD Reqs

One-line diagram of the proposed site  

Same as PNM

"The single line diagram shows the general arrangement

of how the Generating Facility is interconnected with the Utility’s System and shows all major equipment, including visual

isolation equipment, Point of Common Coupling, ownership of equipment and meter location(s). REC/Production meter to be installed. "

Install Reqs

A copy of the site map must be installed in a weather proof conduit at or near the meter and Manual disconnect handle must be clearly identified.

Rate Schedule Link
link
Website
link
Phone
(575) 383-4270

Other details

Restrict Inspection
0
Address ID
149726
Express Planset Eligible
No