Los Alamos County Department of Public Utilities
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Monthly
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- N/A
- Net Excess Generation Notes
If electricity generated by the customer exceeds the electricity supplied by the Utility during a billing period, the Utility shall credit the customer through a balancing account for the excess kilowatt-hours generated, by crediting the customer for the net energy supplied to the Utility. The rate paid or credited to the Customer will be the Utility's average cost for capacity and energy from the Los Alamos County Resource Pool for the previous year. The Customers balancing account shall be closed out annually and any funds owing to the Customer will be paid within 30 days.
- Rebates Offered
- No
- Deregulated
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- DC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Utility Specific Adjustments
- System Size Justification
- Load Justification
- System Offset Notes
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility AC Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- Must show proximity to gas lines (not within 3 feet)
- SLD Reqs
- Install Reqs
- Electrical Stamp Required
- No
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No
- Rate Schedule Link
- link
- Website
- link