JMEC - Jemez Mountains Electric Cooperative

New Mexico Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
N/A
Net Excess Generation Notes

Currently JMEC will apply a kWh credit for each excess kWh produced (Net Metering). This incentive is one kWh produced for one kWh used at the current bill rate. When there is more produced than used for any given month the excess is rolled over to the next month with April as the settle up month. The excess kWhs that are not netted out over the year will be purchased at JMEC's avoided cost as filed with the New Mexico Public Regulation Commission per rule 17.9.570.11.

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
30
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Inverter Oversize Restrictions
0
System Offset Notes


Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-PM-Disco-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Meter Spot Required
1
Allowed Meter Adapter
None

Plans & docs

SLD Reqs


Electrical Stamp Required
0
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(505) 753-2105 ; (888)755-2105

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
143151
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with JMEC - Jemez Mountains Electric Cooperative before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.