City of Truth or Consequences - Electric Division
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
The qualifying facility shall be billed for the net energy delivered from the utility in accordance with the tariffs that are applicable to the qualifying facility. At the end of the billing period, the utility shall net all charges owed to the utility by the qualifying facility. If a net amount is owed to the qualifying facility for the billing period and is less than $50, the payment amount may be carried over to the following billing period. If a net amount is owed to the qualifying facility and is $50 or more, the utility shall make payment to the qualifying facility prior to the end of the next billing period.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
System size is determined in AC (Inverter Nameplate Capacity)
A Renewable Energy system must be sized for the most recent 12-month average usage. Anything under 12 months will not be accepted. Can only size up to 90% of 12 months historical usage
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
1. Location of all, Disconnects, Modules, Batteries, Inverters, Connect of all grounding electrode conductors
2. Show clearances around all equipment
3. Dimensions between equipment and structures
4. Dimensions between equipment and property lines Location of weatherproof plan tube
- SLD Reqs
System size is determined in AC (Inverter Nameplate Capacity)
1. Identify whether the system is stand-alone, grid-tied or hybrid
2. Conductor sizes
3. Conductor insulation type (i.e: THHN, THWN, direct burial cable, etc)
4. Conductor material
5. Conduit sizes
6. Conduit material
7. Overcurrent device ratings
8. Existing and new panel amperage
9. Series and parallel configuration of the module connections.
- Website
- link
Other details
- Restrict Inspection
- 0
- Address ID
- 253424
- Express Planset Eligible
- Yes