Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
"Utility may install an additional meter to measure separately the energy generated by the Producer and then calculate net energy consumed or supplied by the Producer. The Producer will be paid for energy supplied above the amount consumed at Utility’s energy rate for such purchases, as filed with the approved by the NMPRC. Utility will be paid for energy consumed by the Producer in excess of the amount supplied by the Producer at its approved tariff rate applicable to the service provided to the Producer. An additional customer charge to cover the added costs of
billing and administration may be included in the tariff."
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 120
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 36
- Industry Standard Watts Sqft
- 2
- System Size Justification
- Load Justification
- System Offset Notes
We recommend you have the member request a three year history to calculate the size
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- The plans need to be signed by a Professional Engineer licensed in New Mexico
- SLD Reqs
Showing the automatic disconnect
- Electric Service Reqs
in compliance with current National Electric Code, State of New Mexico Building Codes and CDEC standards
- Install Reqs
The Producer shall furnish, install and maintain a clearly labeled load break disconnect switch in avisible outside, readily accessible location for the purpose of isolating Producer’s generation fromthe Utility’s system. The load break disconnect switch must disconnect the Producer’s generator from the Utility’s system without interrupting other types of service to the Producer. The Producer shall provide a map of suitable scale showing the exact location of the switch. Such map shall be asecurable type switch. Ingress and egress to this switch by G&T’s or Distribution Cooperative’spersonnel shall be provided at all times by the Producer. The load break disconnect switch mustcomply with the interconnection and Safety Standards attached as Exhibit D hereto and incorporated herein by reference.
- Electrical Stamp Required
- 1
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Rate Schedule Link
- link
- Website
- link
- Phone
- (505) 285-6656
Other details
- Restrict Inspection
- 0
- Address ID
- 148538
- Express Planset Eligible