VMEU - Vineland Municipal Electric Utility

New Jersey Utility Interconnection & net metering rules
Net Metering Allowed1
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1

Net metering & export

Net Metering Allowed
1
Post Solar Billing Method
Net Metering
Rebates Offered
1
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
90
Offset Calculation Basis
Average
Offset Calculation Period
36
Industry Standard Watts Sqft
2
System Offset Notes

Because Vineland has a relatively large amount of renewable distributed generation, VMEU has areas of high renewable injection, and thus are unable to support installation of new renewable generation in excess of 5 kWAC, if at all.


VMEU allows 90% of the average of either the last one or three years, whichever is lower for residential applicants, and 90% of the last 12 months peak demand for commercial customers


VMEU REQUIRES 12 months of usage and does not allow any form of increase in justification. 11/22/244 - TM

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Install Reqs

The Disconnect Switch or device shall be lockable in the open position with a standard VMEU padlock with a 3/8-inch shank. If the disconnect device cannot be physically locked in the openposition, it must be able to made in operative and the operating mechanism locked, blocked ordrawn out. VMEU shall review and assist the generator owner design an acceptable disconnect device.  

Website
link
Phone
(856) 794-4000

Other details

Restrict Inspection
0
Address ID
134241
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with VMEU - Vineland Municipal Electric Utility before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.