PRED - Park Ridge Electric Department
Net metering & export
- Net Metering Allowed
- 1
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
A customer’s wind or solar photovoltaic systemcannot exceed 90% of the customer’s current peak electric needs of theirresidence or facility, as applicable
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
PE Stamped
- Electric Service Reqs
Refer to Interconnection Policy
- Install Reqs
- The manual disconnect switch will be opened and the inverter will be observed going offline
- Separate driven ground bonded to the main service panel ground connection with a reading of 25 ohms or less. If applicable, all neutrals of the PV system bonded to the main service panel neutral connection.
- Placards
- Manual disconnect switch near revenue meter or permanent mounted sign at revenuemeter indicating accessible location of manual disconnect switch
- Permanent mounted sign with 3 inch letters, and in a format of the labels attached stating“DISCONNECT” at the manual disconnect switch location.
- Website
- link
- Phone
- (201) 391-2113
Other details
- Restrict Inspection
- 0
- Address ID
- 135742
- Express Planset Eligible
- Yes