Orange & Rockland
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- 0
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- Illustrate and label POI (point of interconnection) on the site plan
- Utility bill account number is required on the site plan
- SLD Reqs
- RGM inverter is required, not production meter.
- Install Reqs
- Each individual project must have a distinct ANSI c-12 revenue grade meter dedicated to TREC creation.
- Behind the Meter Systems, the PM must be installed on the side of the transformer that is directly service the building load.
- Integrated Revenue Grade meter, installer must be present for any on-site inspection to grant access to RGM which is housed inside of an enclosure of any kind.
- Electrical Stamp Required
- 0
- Meter Num Req SLD 3LD
- 1
- ESID Num Req SLD 3LD
- 0
- Site Plan Notes
- Rate Schedule Link
- link
- Website
- link
- Phone
- (877) 434-4100
Other details
- Restrict Inspection
- 0
- Address ID
- 134024
- Express Planset Eligible
- Yes