WED - Wolfeboro Electric Department

New Hampshire Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
Post Solar Billing Method
Net Metering
Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes
The maximum installed capacity (AC nameplate rating) of the installed generation equipment shall not exceed 100kW in size and/or 90% of the Customer’s historical peak electrical demand over the 12 month period prior to interconnection

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Install Reqs
The Net Metered Customer will be responsible for providing the interconnected meter socket with combined manual disconnect switch assembly and associated equipment per standards set forth within the New Hampshire Code of Administrative Rules Puc 905.02 Disconnect Switch
Placards
The meter socket cabinet or enclosure must be identified with a permanently affixed placard which clearly states: “NET METERED SERVICE.”
Website
link
Phone
(603) 569-6975

Other details

Restrict Inspection
0
Address ID
136634
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with WED - Wolfeboro Electric Department before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.