Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Roanoke Electric Cooperative

North Carolina Utility Interconnection & net metering rules
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.03
Net Excess Generation Notes

The consumer’s service will be metered with two meters equipped to prevent reverse registration, one that will measure any energy delivered by the Cooperative to the consumer, and the other which will measure any energy produced by the consumer’s renewable energy generation system and delivered to the Cooperative

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
No
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Equipment Approvals
California Energy Commission
ESID Num Req SLD 3LD
0
Website
link
Phone
(800) 433-2236

Other details

Restrict Inspection
0
Address ID
177253
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Roanoke Electric Cooperative before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.