Lumbee River EMC
Net Metering Allowed0
Line Taps Allowed1
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 0
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.03
- Solar Export Value Notes
- As of 11/2022
- Net Excess Generation Notes
Lumbee River EMC agrees to credit the generator member-owner's account for all power generated and delivered through the Cooperative's system metering point at avoided cost.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 1
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- SLD Reqs
Relay Meter Orientation = Over/Under
- PV production meter required between the AC disconnect switch and the existing utility meter.
- Top of PV meter wired toward inverter, Bottom toward utility.
- Wires from the bottom of the Production meter must connect to the source side (Top side) of the Utility meter with a Lugged Connection. See Projects 368482, 350568, 371600 for example. The only method of interconnection allowed is Line Side Tap inside Meter Can.
Existing System
- Only one PV meter required
- Install Reqs
- Interconnection Customer shall install a manual load-break disconnect switch with a clear visible indication of switch position between Cooperative's electric system and Interconnection Customer's Generator
- Placards
- Interconnection Customer will install a permanent warning label in a conspicuous place in close proximity to the electric meter or on the meter base to notify them personnel that there is a generator installed on the load side of the meter. The warning label shall not be placed in a location that would interfere with the ability of Cooperative personnel to read the electric meter. Interconnection Customer shall also place a warning label on the Isolation Device. The warning labels must be in place before the Generator can be interconnected with Cooperative's System.
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Electrical Diagram Notes
- Website
- link
- Phone
- (910) 843-4131
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 177166
- Express Planset Eligible
- Yes