Fayetteville Public Works Commission
Net Metering Allowed0
Supply Side Taps Allowed0
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 0
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Other
- Solar Export Rate
- 0.0643
- Solar Export Value Notes
- See Net Excess Generation Explanation
- Net Excess Generation Notes
Effective 05/01/2023
Renewable Energy Buy Back (REBB) 10 kW AC or Less
- Allows for home or business to utilize energy generated by solar equipment first and exports excess to PWC’s electric grid
- Customer receives monthly bill credit for all exported energy ($0.06348 per kWh)
- Excess production does not carry forward to the next month’s bill
Buy All Sell All (BASA) 10.01 kW AC to 20 kW AC
- Customer receives credit for all energy generated at BASA customer credit rate ($0.0623 per kWh)
- Excess production that cannot be credited during the billing period does carry over and will be applied to future month’s energy charges
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 20
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
- Max System Size: 20.00 kW AC
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- Situational
- Production Meter Criteria
- 10 kW AC or Less: No production meter
- Over 10 kW AC: Production meter required
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- Disconnect must be installed immediately adjacent to the meter for the PV system
- Disconnect must be accessible to the utility at all times
Note regarding battery projects:
- PV systems with storage are prohibited from injecting stored energy into PWC's electric grid.
- Integrated energy storage must be configured to prohibit the export of power. Systems found injecting stored energy will be disconnected without notice and will remain disconnected until it can be demonstrated that the energy storage has been reconfigured to restrict the flow of power to the grid
- SLD Reqs
Requirements:
- Phases, neutral and ground
- Equipment
- Fusing
- Points of connection
- Disconnects - DC and AC
- Array wiring
- Equipment grounding
- Meter base labeling
- Physical arrangement of metering and disconnect distance in feet between the isolation switch (PV A/C disconnect) and customer meter. The disconnect must be lockable, heavy duty, fused, and sized per the NEC.
- Install Reqs
Completed photos of the equipment (BOS), taken when placards are installed
- Placards
- Disconnect must be labeled in accordance with NEC 705.10
- A permanent warning label must be placed in a conspicuous place in close proximity to the electric meter or on the meter base to notify Utility personnel that there is a generator installed on the load side of the meter.
- A warning label must be placed on the Isolation Device
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (910) 223-4600
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 1182005
- Express Planset Eligible
- No