Dominion Energy (NC)
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 1
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
Once the final interconnection notification form is approved, the customer’s 12-month net metering period begins. The energy your renewable energy generator produces will offset the energy you would normally purchase from Dominion Energy.
If you generate more electricity than is needed for your home or business in a given billing period, the amount will be credited to your account to offset the cost of future electricity you receive from Dominion Energy. The billing period credit is accumulated, carried forward and applied at the first opportunity to any billing periods in which you have positive net consumption. Please note that even if a credit is issued, the customer will still receive a bill each month with basic monthly charges.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Restrictions
- 20
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Residentials can only go up to 20kw and they can offset a 100% of the electricity generation. I will review that last 12 months of the customers usage to determine approval. I will let you know if there are any issues.
The "Residential Infomation Sheet" required for any customer that has less than 7 months of electric usage.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
See SLD Requirements
- SLD Reqs
- Production Meter must be wired like this: Inv > bottom of PM > AC Disco > POI. (See "Dominion Production Meter TLD" in the Files section of this page.)
Complete “Single Line Diagram” document in the Files section of this page. Follow instructions in the "Note" section.
1. If required, a Non-Utility Meter Socket may be installed between the PV Modules and the Co-Gen Meter Socket. 2. The PV Disconnect shall be load break rated and shall provide a visible air gap and be lockable in the off position. Locate immediately adjacent to the service meter. It must be accessible to the power company personnel 24/7. 3. Specify the point of common Coupling for the solar and existing house wiring. Check box if Main Service Panel is located indoors.
Energy Storage System
Utility requires a single visible-break AC Disconnect to isolate both the PV and batteries.
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Rate Schedule Link
- link
- Website
- link
- Phone
- (866) 366-4357
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 1
- Address ID
- 150013
- Express Planset Eligible
- Yes