City of Rocky Mount (NC)

North Carolina Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedNo
NEM TypeN/A
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
No
NEM Type
N/A
TOU Utility
No
Post Solar Billing Method
Feed-in-Tariff
Solar Export Type
Fixed kWh
Solar Export Rate
0.0324
Net Excess Generation Notes

The process by which the City purchases energy generated is through a bilaterial metering process. The customer will have a meter supplied by the city that measures the energy the customer receives from the electric utility provider as well as a second meter that measures the output from the generating device. A credit for each kilowatt hour produced will be applied to the customer's monthly utility bill.

Rebates Offered
No
Deregulated
No
Allows Standby
No

Interconnection & taps

Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Rocky Mount (NC) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.