City of New Burn
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 1
- Post Solar Billing Method
- Feed-in-Tariff
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.0487
- Solar Export Value Notes
- The customers service shall be metered with two meters - one to measure all energy provided by the City and used by the customer, and all other to measure the amount of energy generated by th
- Rebates Offered
- 0
- Deregulated
- 1
- Allows Standby
- 0
Interconnection & taps
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
Other details
- Express Planset Eligible
- Yes