City of Monroe
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 1
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.0618
- Solar Export Value Notes
- On peak: $0.0583/ Off Peak: $0.0311
- Net Excess Generation Notes
Qualified customers must be generating energy for purposes of a “net billing” arrangement to receive credits under this rate rider. Any power generated by the participating customer’s solar system is first used inside the home or business, and any excess produced power flows back to the power grid. The City will purchase this power from the customer at the rate detailed in the City’s fee schedule by the Renewable Energy Credit Rate Rider (RECR-1).
Solar arrays below 20kW of installed capacity (DC) - Applicable to Rate (R) and (SC)*
• The customer will be billed according to their retail rate schedule on metered electricity delivered to the customer with the following modifications: o Additional metering costs $2.43/month • Credited 6.18 cents per kWh for energy delivered by the customers to the City.
Solar arrays between 20kW - 100kW (DC) - Not Applicable to Rate (R)**
• The customers will be billed according to their retail rate schedule on metered electricity delivered to the customer with an additional meter charge of $2.43/month and credited at a fixed amount at the rates listed below: o On-Peak Energy $0.0583 o Off-Peak Energy $0.0311
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 20
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Utility has a 20kW DC max system offset.
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
Plans & docs
- SLD Reqs
- Must be signed and stamped by a Professional Engineer
- Fused disconnect required, even with breaker tie in
- Electrical Stamp Required
- 1
- Website
- link
- Phone
- (704) 282-4690
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 773558
- Express Planset Eligible
- Yes