Report a correction Net Metering AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- No
- TOU Utility
- No
- Post Solar Billing Method
- Feed-in-Tariff
- Solar Export Type
- Other
- Solar Export Value Notes
- $0.02558 per kWh
- Net Excess Generation Notes
Energy measured as kWhs at the renewable energy generator meter shall be credited at the NCEMPA energy wholesales power rate.
- Rebates Offered
- No
- Deregulated
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 20
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No
- Website
- link
- Phone
- (910) 671-3800
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- Yes