Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

After each monthly billing cycle, any excess kilowatt-hours generated are placed into a bank on the customers electric account. Based on the energy usage, banked kilowatt-hours will automatically be deducted from the account up to April 1

Rebates Offered
No
Deregulated
Yes
Allows Standby
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
10
System Size Restriction Type
DC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

100% offset or 10 kW DC (whichever is less). System may not exceed 10 kW DC but may exceed the 100% offset reasonably.

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Utility Disconnect Switch
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • Disconnect switches near the meter are required. If it cannot be installed near the meter, a mapping placard of its location is required.
SLD Reqs

Standard

Electric Service Reqs

AC Disconnect Required

  • Accessible, visible and lockable disconnect switch is to be provided by the member in an appropriate curcuit which is lockable in the open position only.
  • Must be located at the members electric meter
  • Clearly marked "Generator Disconnect Switch"
Install Reqs
  • Powering a system (including testing) is NOT permitted before we program (cogen) the meter, this will result in a tampering and meter fee.
Placards

AC Disconnect:

  • Clearly marked “Generator Disconnect Switch” on a weather resistant placard.
Electrical Stamp Required
No
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Website
link
Phone
(406) 348-3411

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes