Montana-Dakota Utilities Co.

Montana Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

If the energy supplied by the customer generator exceeds the amount of energy supplied by the Company, the net Kwh shall be credited to the customer’s next monthly bill. The balance of the energy generated shall appear as a credit on the customer’s account until the customer’s consumption offsets the credit or the end of the designated 12-month billing period, which ever occurs first. At the end of the 12-month period any unused Kwh credit accumulated during the previous 12-months will be granted to the Company with no compensation to the customer. The customer shall designate the start date of the 12-month billing period as January 1, April 1, July 1 or October 1.

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

The proposed small generator facility must not exceed the capacity of the existing service.

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Standard (not required for interconnection submittal)

SLD Reqs

Standard, must show the following:

  • Service line, Meter, Load centers, Inverters, Generators and Disconnect Switch
Electric Service Reqs

Disconnect Required:

  • Must include a disconnect device.
  • Disconnect device shall be capable of isolating the small generation facility from the distribution system.
  • Must allow for a visible break and must have the ability to be locked open.
  • Location shall be within ten feet of the utility meter unless special permission is granted by the utility.
Electrical Stamp Required
0
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(406) 359-3126

Other details

Revision Required
1
Mod Swap Requires Planset
1
Address ID
4777643
Express Planset Eligible
Yes