Montana Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
Post Solar Billing Method
Net Metering
Net Excess Generation Notes
"2.2.1 MEC will not purchase energy produced by the Member; 2.2.2 Name-plate generating capacity generally may not exceed 10 kW; 2.2.3 All member request for net metering beyond the 10kW limit will be reviewed by MEC’s Manager of Engineering and presented to MEC’s Board of Trustees for consideration. In no case will the allowable nameplate generating capacity rating exceed 50 kW. 2.2.7 Charges for energy delivered by MEC in excess of the energy flowed back onto the system shall be billed monthly at a retail rate. Excess kWh’s may be banked beyond the monthly billing period. (banking is a method of accounting, within an annual billing period, for energy produced for export into the distribution system for later use at that customer’s service); 2.2.8 MEC may annually true-up (zero) banked kWh’s. The true-up will occur following the April billing cycle.
Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Inverter Oversize Restrictions
0
System Offset Notes
Nameplate generating capacity shall not exceed 10 kW.
Offset Calc Tool
PV Watts

Plans & docs

Site Plan Reqs
The components of the system up to the meter/service point.
SLD Reqs
One-Line diagram showing the configuration of all Small Generating Facility equipment, current and potential circuits, and production and control schemes.
Install Reqs
No PM, but please be aware our meter will only read the energy being transferred onto our system. Most people are using power as they generate so what they will see on their bill won’t necessarily reflect what they are producing.
Placards
Required by NEC
Equipment Approvals
California Energy Commission
Website
link
Phone
(406) 541-4433

Other details

Address ID
271484
Express Planset Eligible
Unknown
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Missoula Electric Coop before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.