Mid-Yellowstone Electric Cooperative
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
At the end of each month, if the Member/Generator has generated more electricity than they used, the Cooperative credits (banks) the net kilowatt-hours produced at the retail power rate. If the Member/Generator uses more electricity than they generate, they pay the difference. Member generation in excess of monthly usage will be allowed to accrue into future periods for the current member at the service location. Accumulated energy credits expire at termination of service, transfer of service to another member, or April 20th of each year, without any compensation to the current member. Credit for energy may only be taken as a per kWh credit against member's monthly billed energy usage. Member/Generator generated kilowatt hour credits cannot be used to offset demand charges, reactive power charges, or the monthly basic charge.
*** BATTERIES:
Members may wish to install emergency or standby generators for those times there is a prolonged outage on the Cooperative system. The output from these installations is not considered for the purposes of Net Metering
- Rebates Offered
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Maximum: 10 kW AC
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
Standard
- Install Reqs
AC Disconnect must be installed NEXT to the utility meter
- Electrical Stamp Required
- 1
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (406) 342-5521
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 0
- Address ID
- 4137615
- Express Planset Eligible
- Yes