Liberty Utilities (MO)
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
To the extent the net consumption is negative (i.e. Customer-Generator produced more kWh during the month than the Company supplied), the Customer-Generator will be credited in accordance with the Company’s bi-annually calculated avoided fuel cost of the net energy (kWh) delivered to the Company. With the exception of the Energy Charge, all other applicable standard rate charges shall apply.
Summer Season: $0.0538/kWh
Winter Season: $0.0493/kWh
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 100
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
Standard -
- The diagram must clearly show the routing and connection(s) of all conductors, i.e. line one, line two, neutral and ground) in the path form the grid-tie inverter to the load panel and include references to the Company’s Point of Service
- Electric Service Reqs
Net metering interconnection equipment, such as power inverters, must be IEEE 1547 compliant as certified by UL 1741 testing in order to be approved by Liberty for Net Metering installations.
- Install Reqs
AC Disconnect Required MUST BE ACCESSIBLE 24/7
- Placards
All placards need to be black with white lettering.
Please review the placard examples uploaded to the files.
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Electrical Diagram Notes
- The checklist MUST be completed to ensure commissioning will be accomplished.
- Please complete and sign the post certificate.
- Ensure the installer has the Net Metering Installer Requirements on hand during installation.
- If the meter is in the backyard with dogs at any point and time, the disconnect will have to move outside the fence. NO EXCEPTIONS.
- If the meter is in a locked fenced in area, the disconnect will have to move outside the fence or a combination lock will need to be installed and code provided. NO EXCEPTIONS.
- Rate Schedule Link
- link
Other details
- Revision Required
- 1
- Express Planset Eligible
- Yes