Evergy Missouri Metro

Missouri Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

If the electricity generated by the Customer-Generator exceeds the electricity supplied by the Company during a billing period, the Customer-Generator shall be billed for the appropriate Customer charges for that billing period in accordance with the Company Obligations section of this tariff and shall be credited with the product of the excess kilowatt-hours generated during the billing period and the rate identified in Schedule PG, Sheet 31A in the following billing period. This rate is calculated from the Company’s avoided fuel cost;

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
100
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Existing Homes

Last 12 months of usage (in kWh) / 8760 (hours in a year) / 0.144 (Evergy’s capacity factor - 14.4%) 

Example

  • Customer’s usage = 8500 kWh over the last 12 months ï‚· Calculation = 8500 / 8760 / 0.144 ï‚· Maximum system size = 6.72 kW

For customers less than 12 months usage:

Load Worksheet is available on KCPL.com


** Future loads:

"We are unable to consider potential future load, such as a pool addition or a new electric vehicle, when calculating the maximum system size."


New Construction

There is one exception to the maximum system size calculation, new construction. If an account was recently constructed and does not have 12 months of usage data, then we utilize the square footage of conditioned space for the building to estimate the annual usage

Formula

Sq. Footage x 7.15


Example

  • Building has 1500 sq. ft of conditioned space
  • Calculation 1 = 1500 x 7.15
  • Estimate usage = 10,725 o Calculation 2 = 10,725 /8760 / 0.144
  • Maximum system size = 8.50 kW
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Utility Disconnect Switch
Meter Adapter Requirements

"As of today, Evergy has update their DER standards to allow three different meter

collar adapters. Evergy is approving these 3 meter collar connections only.

--GenerLink

--Tesla Backup Switch

--ConnectDER

Evergy personnel, along with the electrician, will need to be onsite together when the

meter adapter is installed. Until our installer portal is updated to collect information on

meter collars (expected in January 2025), please notify us in the portal when a post _x0002_inspection is requested for a meter collar installation"

Allowed Meter Adapter
ConnectDER,Tesla Backup Switch,ConnectDER,Tesla Backup Switch

Plans & docs

Site Plan Reqs

Standard

  • legible map of the location and meter location shall be included
SLD Reqs

Standard

Electric Service Reqs

IEEE 1547, UL 1703 and UL 1741

Install Reqs

AC Disconnect required

Electrical Stamp Required
0
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(816) 242-5971

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
8597512
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Evergy Missouri Metro before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.