Carthage Water and Electric Plant (CWEP)

Missouri Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

If the electricity generated by the customer-generator exceeds the electricity supplied by Carthage Water & Electric Plant during a billing period, the customer-generator shall be billed for the appropriate customer charges for that billing period and shall be credited an amount at least equal to the avoided fuel cost of the excess kilowatt-hours generated during the billing period, with this credit applied to the following billing period

Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Website
link