People's Energy Cooperative
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Monthly
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
The Cooperative shall bill the QF for the excess of energy supplied by the Cooperative above energy supplied by the QF according to the Cooperative's applicable retail rate schedule. The Cooperative shall pay the member for the energy generated by the QF that exceeds that supplied by the Cooperative at the Average Retail Cooperative Energy Rate (ARCER) $0.10873/kWh
- Rebates Offered
- Yes
- Deregulated
- No
- Allows Standby
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- Yes
System size & offset
- System Size Restrictions
- 40
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- No
- System Offset Notes
If participating with the utility's incentive program:
- 120% offset requirement
If not participating with the utility's incentive program:
- Systems below 40 kW AC will not have any offset requirement
- Systems over 40 kW AC must not be sized over 120% of their historical usage
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
Plans & docs
- SLD Reqs
Meter Orientation = Under/Over
- Production meter sockets shall be wired with the load side at the top and the line side at the bottom. PEC prefers that the production meter be located upstream from any customer disconnects.
- Electric Service Reqs
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- Yes
- ESID Num Req SLD 3LD
- No
- Electrical Diagram Notes
- Rate Schedule Link
- link
- Website
- link
- Phone
- (507) 367-7000
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- Yes