New Prague Utilities Commission

Minnesota Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

The customer may choose their preferred post-solar billing option. A. 'Average retail utility energy rate' (NEM Monthly), B. 'Simultaneous purchase and sale billing rate' (Export), or C. 'Roll-over credits' (NEM Annual). The customer may also choose whether they would like the excess credit applied to their bill or paid out by check for options A and B.

Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
Yes

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

The 120% offset rule does not apply to systems under 40 kWac if the customer is not applying for the rebate.

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect

Plans & docs

Site Plan Reqs

Standard

SLD Reqs

Meter Orientation = Under/Over


  1. Production Meter: Yes
  2. AC disconnect label: Generator Disconnect Switch
  3. AC disco to PM to POI
  4. Utility meter label: General Service Meter
  5. PM bottom to top of utility meter.
Electric Service Reqs

IEEE 1547

UL 1741

NFPA 70

ANSI C84.1

Install Reqs

AC Disconnect required

Electrical Stamp Required
No
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Electrical Diagram Notes


Website
link
Phone
(952) 758-4401
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with New Prague Utilities Commission before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.