Lake City Utilities (MN)

Minnesota Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
TOU Utility
No
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.097
Solar Export Value Notes
$0.108/kWh (Urban); $0.097/kWh (Rural)
Net Excess Generation Notes

When the energy generated by the qualifying facility exceeds that supplied by the Utility to the customer at the same site during the same billing period, the Utility shall compensate the qualifying facility for the excess energy at the average retail Utility energy rate. ($0.11/kWh)

Rebates Offered
No
Deregulated
No
Allows Standby
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
20
System Size Restriction Type
AC kW

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Website
link
Phone
(651) 345-4711

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Lake City Utilities (MN) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.