Elk River Municipal Utilities

Minnesota Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
TOU Utility
No
Post Solar Billing Method
Net Metering
Solar Export Type
N/A
Net Excess Generation Notes

 The utility shall bill the customer with an interconnected qualifying facility for the excess of energy supplied by the utility above energy supplied by the qualifying facility during each billing period according to the utility's applicable retail rate schedule. When the energy generated by the qualifying facility exceeds that supplied by the utility to the customer at the same site during the same billing period, the utility shall compensate the customer for the excess energy at the average retail utility energy rate.

Rebates Offered
No
Deregulated
No
Allows Standby
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
40
System Size Restriction Type
AC kW
System Size Battery Included
Yes
System Size Includes Existing Systems
Yes
Offset Type
No Restrictions
Inverter Oversize Restrictions
No
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-PM-Disco-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Utility Disconnect Switch
Allowed Meter Adapter
None,None

Plans & docs

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Rate Schedule Link
link
Website
link
Phone
(763) 441-2020

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Elk River Municipal Utilities before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.