Delano Municipal Utilities
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
Kilowatt-hours produced by the QF in excess of the monthly usage shall be supplied as an energy credit on the customer’s energy bill, carried forward and applied to subsequent energy bills, with an annual true-up on December 31. Excess energy credits existing as of December 31 shall default back to the Utility with no compensation to the QF
- Rebates Offered
- 0
- Deregulated
- 1
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 40
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
System can be sized up to 40 kW AC (no offset requirement)
If the system is over 40 kW AC, then the system must not go over 120% of their historical usage.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
Plans & docs
- Site Plan Reqs
Site Diagram shall include the following:
- Shall be to scale
- Location of DER
- Location of meter
- Location of AC disconnect
- Location of PCC/RPA/PoC
- Location of underground/overhead electrical wires ď‚§ If underground, shall include any easements/right of ways
- SLD Reqs
The one-line diagram shall include, but not limited to, the following information:
- Applicant Name
- Application ID
- Installer name and contact information
- Address where DER system will be installed
- Correct electrical position of all equipment, including but not limited to: Panels, Inverter, DC and AC disconnects.
- Distance between equipment
- Labeling found on equipment
- Total Aggregated AC nameplate rating of DER
- DER protection elements
The one-line diagram shall be signed and stamped by a Minnesota Professional Engineer if the DER is larger than 20 kW and uncertified or larger than 250 kW and certified.
- Install Reqs
AC Disconnect Required
- The Utility AC disconnect used by the Area EPS Operator to safely isolate the DER from the Area EPS shall be located within 10 feet of the revenue meter
Production Meter Required
- The meter socket shall be installed in a location that meets the following specifications:
- The center of the meter socket shall be located at a height between 4 to 6 feet above the ground.
- Location and path to the meter socket must be continuously clear and free of hazards for anyone accessing the meter.
- Meter sockets must be a minimum of 3 feet away from a gas meter and 6 feet away from combustible storage.
- Meter sockets shall have unobstructed space of at least 3 feet in front and 1 foot to each side.
- Meter sockets shall be installed within 10 feet of the main utility meter.
- Placards
All signage and labeling shall meet applicable NEC requirements including NEC 110.21 (B), 690.13 and 750.10.
- The Utility AC disconnect shall be labeled as “UTILITY AC DISCONNECT”. The Utility AC Disconnect shall be located within 10 feet of the main service meter
- The production meter shall be labeled as “DER PRODUCTION METER” or similar. If there are multiple DER types present at a location the production meter shall indicate the type of DER behind the meter
- Electrical Stamp Required
- 1
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Address ID
- 9391419
- Express Planset Eligible
- No