City of North St. Paul
Net Metering Allowed0
NEM TypeN/A
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 0
- NEM Type
- N/A
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Other
- Solar Export Value Notes
- Same as energy charge
- Net Excess Generation Notes
Net Excess Generation Explanation The utility will compute the charges and payments for purchases and sales for each billing period. Any net credit to the QF will be made as a credit to the QF's account within the utility. ($0.118)
- Rebates Offered
- 1
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- No
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Restrictions
- 40
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
40 kW or less: System doesn't have any offset requirement
System over 40 kW: 120% offset
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
Plans & docs
- Site Plan Reqs
- SLD Reqs
- Electric Service Reqs
- Install Reqs
- Placards
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (651) 747-2400
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 7185787
- Express Planset Eligible
- No