Indiana Michigan Power

Michigan Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Fixed kWh
Solar Export Rate
0.11375
Net Excess Generation Notes

The customer will be credited on outflow for the billing period or time-based pricing period. The credit shall be applied to the current billing month and shall be used to offset charges on that bill. The credit shall not offset the customer service charge. Any excess credit not used will be carried forward to

subsequent billing periods. Unused outflow credit from previous months will be applied to the current billing month, if applicable. Outflow credit is non-transferable. (credit rate for excess generation is $0.11375)

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
110
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Utility Specific Adjustments


System Offset Notes


Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Utility Disconnect Switch

Plans & docs

Site Plan Reqs


Electric Service Reqs
  • The utility requires a minimum of 200A service.
  • Customer-Owned Meter Socket Specifications: Enclosure Construction (aepnationalcustomers.com) (Production Meter is not required in the state of Michigan)
  • Requirements for Electrical Service: Requirements For Electrical Service (aepnationalcustomers.com)


Install Reqs
  • Area shall be cleared of obstructions 15" on each side and 48" in front of meter
  • Entrance and exit conduits shall be installed using the knockout holes provided by the manufacturer
  • Production Meters are not required in Michigan per AEP
  • Area surrounding the current electrical meter up to 2 feet in all directions
Placards
  • Must follow NEC standard placard requirements
Electrical Stamp Required
0
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link

Other details

Restrict Inspection
0
Express Planset Eligible
Yes