KLPD - Kennebunk Light & Power District

Maine Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

If the electricity generated during the billing period by the eligible facility plus any kilowatt-hour credits from prior billing periods exceed the customer's or the shared financial interest customers’ kilowatt-hour usage during the billing period, the excess shall be applied to the customer's bill or the shared financial interest customers’ bills for the following billing period as a reduction in the customer's kilowatt-hour usage.

Rebates Offered
No
Deregulated
Yes
Allows Standby
Yes

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Website
link
Phone
(207) 985-3311
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with KLPD - Kennebunk Light & Power District before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.