Taunton Municipal Lighting Plant

Massachusetts Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedYes
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

If the electricity generated by the Customer exceeds consumption and is distributed back to TMLP during the billing period, then the Customer shall be billed for the same monthly service charge as applied to other customers of the TMLP in the same rate class; not be charged any kilowatt hours taken from TMLP and shall be credited for the net excess kilowatt hours generated as applied to the generation and Power Cost Adjustment (PCA) charges during the billing period; with this kilowatt-hour credit appearing on Customer’s bill for the following billing period.

(Consumption from TMLP) - (Excess Generation put onto the TMLP Grid*) - (PCA Cost) + (TMLP Monthly Service Charge) = Your Invoice Amount *Excess generation is credited at the ‘generation charge’ for your rate. Please see TMLP rate sheets for the exact amount: https://www.tmlp.com/electric/rates/

Rebates Offered
No
Deregulated
No
Allows Standby
Yes

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
Yes
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

Include metering points in relation to TMLP's Electrical system and the customer's generating system location.

Placards


Electrical Stamp Required
No
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Site Plan Notes


Electrical Diagram Notes

All Jobs [AC Disconnect will be no further than 4′ from utility meter]

Website
link
Phone
(508) 824-3177
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Taunton Municipal Lighting Plant before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.